Perspectives

DRC Rebuild: Turning Peace Into Power

Jul 17, 2025 · 6 min read

How could mineral wealth, infrastructure, and local ownership shape the DRC’s future? Questions for a longer-term view.

Evidence reviewed: 28 October 2026

Behind the numbers

DRC mineral production and electricity access. Figures refer to different reference periods; they describe a structural tension, rather than a forecast of returns.

75%

Estimated share of world cobalt production

Production strength creates relevance to global buyers. It does not tell a local business which part of the supply chain it can profitably serve. Separate the mineral headline from the buyer’s actual requirements.

DRC · 2024 ↗
21%

People with access to electricity

Limited electricity access makes energy reliability a business-model question. A processing opportunity may depend as much on power quality and cost as on the mineral itself.

DRC · reported June 2025 ↗
$250m

IDA credit approved for the first phase of the Inga 3 development programme

Approved financing points to a possible development path. A supplier should distinguish work that can be contracted today from demand contingent on later infrastructure milestones.

World Bank · June 2025 ↗

The story behind the figures

The deeper gap is the connection between resource value and businesses able to deliver locally. Demand, infrastructure and supplier readiness have to meet in the same place and at the same time.

Mineral importance and domestic industrial capability are different things. A strong position in cobalt production does not by itself provide reliable power, processing capacity or local supplier participation.

The practical question is sequencing: which activity can work with today’s power, transport and skills, and which depends on infrastructure that is still being developed?

An infrastructure announcement is a starting point for diligence. Check procurement, delivery milestones, financing and actual operating capacity before building a business case around it.

Gaps worth investigating

Questions for further diligence, not validated investments or guaranteed opportunities.

Processing that can actually run

Which processing or supplier activities are viable with power available today, rather than power promised for the future?

Local supplier readiness

Where do maintenance, testing, transport or skills gaps prevent local firms from winning work? Validate demand with buyers before investing.

Value beyond extraction

What would contracts, workforce development and accountable local participation need to look like for value to stay in the economy?

From diagnosis to a practical response

  • Choose a specific buyer need in processing, maintenance, logistics or another supporting activity.
  • Test the opportunity against power, transport, skills, procurement and payment constraints.
  • Build a phased opportunity map that separates viable first moves from infrastructure-dependent bets.

Tell us which part of the value chain you are considering. We can help define the checks and first moves that would make it a credible business proposition.

Sources & scope

USGS · Congo (Kinshasa) mineral profile ↗

2024 production estimate; country profile available in 2026. This is production share, not ownership or a share of all critical minerals.

World Bank · Inga 3 development programme ↗

3 June 2025 release. Electricity access is the figure reported then. The credit is approved financing, not proof that generation capacity has been built.